Frequently Asked Questions
Do you need to prepare the site before the pool is delivered?
Yes. Before your prefabricated pool is delivered, the site must be prepared in accordance with the manufacturer’s technical recommendations and installation requirements. This includes, in particular, earthwork, preparing the foundation, and ensuring there is adequate access for transporting and installing the pool.
Proper site preparation facilitates installation and contributes to the longevity of your pool. Aqua Conception can provide you with information on the steps to take based on the installation option you choose.


